Risk Assessment Form for Trades & Construction

Risk Assessment Form for Trades & Construction

Free, customisable risk assessment form designed specifically for Australian trades & construction businesses. Copy, customise, and automate - built by Harvard-educated experts.

15 min
Setup time
100%
Customisable
50+
Businesses served
Free
No cost

Setup Time

15 minutes

Complexity

intermediate

Tools

Asana, Notion

Template

Copy this template and customise it for your business.

# Risk Assessment Form - Trades & Construction

## Purpose
Complete before starting work on new sites, introducing new processes, or as part of your regular WHS program.

## When to Use
A workplace risk assessment form with hazard identification, risk rating matrix, control measures, and responsible person assignment.

## Instructions
1. Review the template below and familiarise yourself with the structure
2. Replace all [bracketed placeholders] with your trades & construction business details
3. Customise the tone and formatting to match your brand
4. Save in your preferred tool (Asana or Notion)

---

## Risk Assessment Form

**Purpose:** Systematically identify workplace hazards, assess risk levels, and document control measures to comply with WHS legislation and protect your team.

### Section 1: Assessment Details
| Field | Type | Required | Validation | Placeholder |
|-------|------|----------|------------|-------------|
| Assessment Title | Text | Yes | Min 5 characters | e.g., Warehouse Operations Risk Assessment |
| Site or Location | Text | Yes | - | e.g., 45 Industrial Drive, Smithfield NSW |
| Date of Assessment | Date | Yes | - | DD/MM/YYYY |
| Assessor Name | Text | Yes | - | Jane Smith |
| Assessor Role | Text | Yes | - | WHS Officer |
| Activity or Process Being Assessed | Textarea | Yes | Max 500 characters | Describe the work activity, task, or process being assessed... |
| Assessment Type | Radio | Yes | - | Initial / Periodic Review / Post-Incident / Change of Process |
| Next Review Date | Date | Yes | Must be within 12 months | DD/MM/YYYY |

### Section 2: Hazard Identification
*Add one entry per identified hazard. Use "Add Another Hazard" for multiple entries.*

| Field | Type | Required | Validation | Placeholder |
|-------|------|----------|------------|-------------|
| Hazard Number | Auto-generated | Yes | Sequential: H1, H2, H3... | - |
| Hazard Description | Textarea | Yes | Min 10 characters, Max 500 | Describe the hazard: what is it, where is it, when does it occur? |
| Hazard Category | Dropdown | Yes | - | Physical / Chemical / Biological / Ergonomic / Psychosocial / Electrical / Working at Heights / Mobile Plant / Manual Handling / Other |
| Who is at Risk? | Checkbox (multi-select) | Yes | Min 1 selected | Employees / Contractors / Visitors / Public / All |
| How Could Harm Occur? | Textarea | Yes | Max 500 characters | Describe the potential injury or illness and how it could happen... |

### Section 3: Risk Rating (per hazard)

**Likelihood Scale:**
- 1 = Rare (could happen but very unlikely)
- 2 = Unlikely (could happen but not expected)
- 3 = Possible (might happen at some time)
- 4 = Likely (will probably happen in most circumstances)
- 5 = Almost Certain (expected to happen in most circumstances)

**Consequence Scale:**
- 1 = Insignificant (no injury, minor inconvenience)
- 2 = Minor (first aid treatment, minor property damage)
- 3 = Moderate (medical treatment, temporary disability)
- 4 = Major (serious injury, hospitalisation)
- 5 = Catastrophic (death, permanent disability)

| Field | Type | Required | Validation | Placeholder |
|-------|------|----------|------------|-------------|
| Likelihood (before controls) | Dropdown (1-5) | Yes | - | Select likelihood |
| Consequence (before controls) | Dropdown (1-5) | Yes | - | Select consequence |
| Risk Score (before controls) | Auto-calculated | - | Likelihood x Consequence | e.g., 15 (High) |
| Risk Level (before controls) | Auto-calculated | - | Low (1-4) / Medium (5-9) / High (10-15) / Extreme (16-25) | - |

### Section 4: Control Measures (per hazard)
| Field | Type | Required | Validation | Placeholder |
|-------|------|----------|------------|-------------|
| Control Measures in Place | Textarea | Yes | Min 10 characters, Max 1000 | Describe what controls you will implement (use the hierarchy: Eliminate > Substitute > Isolate > Engineering > Administrative > PPE)... |
| Hierarchy of Control Level | Dropdown | Yes | - | Elimination / Substitution / Isolation / Engineering Controls / Administrative Controls / PPE |
| Responsible Person | Text | Yes | - | Name and role |
| Implementation Date | Date | Yes | - | DD/MM/YYYY |
| Likelihood (after controls) | Dropdown (1-5) | Yes | - | - |
| Consequence (after controls) | Dropdown (1-5) | Yes | - | - |
| Residual Risk Score | Auto-calculated | - | - | e.g., 6 (Medium) |

### Section 5: Sign-Off
| Field | Type | Required | Validation | Placeholder |
|-------|------|----------|------------|-------------|
| Assessor Signature | Text | Yes | - | Type full name as signature |
| Manager Approval | Text | Yes | - | Manager name |
| Workers Consulted | Textarea | Yes | Max 300 characters | List workers consulted during the assessment |

### Conditional Logic
- If any "Risk Level (before controls)" = "Extreme", require manager approval before work commences and flag to WHS Officer
- If "Risk Level (after controls)" remains "High" or "Extreme", trigger additional review with senior management
- If "Assessment Type" = "Post-Incident", link to incident report number

### Submission
- **Button text:** "Submit Risk Assessment"
- **Confirmation message:** "Risk assessment has been submitted and logged. All responsible persons will be notified of their assigned control measures."
- **Notification:** Email all responsible persons with their assigned actions, file in WHS register, schedule review date reminder

---

**Complexity:** intermediate | **Setup time:** 15 minutes | **Tools:** Asana, Notion

Note: This template has been tailored for trades & construction businesses in Australia. Adjust terminology and compliance references to match your specific context.

How to Use This Template

Follow these steps to get the most out of this template.

1

Save the customised version as a reusable template in your document management system

2

Test the risk assessment form with a small group or internal team before full rollout

3

Train your trades & construction team on when and how to use this template in their daily workflow

4

Schedule a quarterly review to update the template based on feedback and changing requirements

5

Review each section to ensure it matches your brand voice and requirements

Customisation Tips

Make this template your own with these recommendations.

Create multiple versions for different customer segments or use cases

Add industry-specific terminology and compliance language relevant to your trades & construction sector

Replace all placeholder text in [brackets] with your trades & construction actual business information

Connect dynamic fields to your CRM or automation platform for auto-population

Frequently Asked Questions

Frequently Asked Questions

Need This Template Automated?

Let our Harvard-educated team build this into a fully automated workflow for your business. 50+ Australian businesses already trust Clever Ops.